Our Projects

Showcasing our finest work and exceptional craftsmanship

Featured Projects

Our most impressive and challenging projects
Slide 1

Modern Luxury Home - Newport Beach

Contemporary rough framing for a stunning 5,000 sq ft luxury residence with complex architectural elements

Size

5,000 sq ft

Duration

8 weeks

Location

Newport Beach, CA

Year

2024

Slide 2

Custom Deck & Pergola - Laguna Beach

Handcrafted outdoor living space with premium wood rough framing and custom architectural elements

Size

800 sq ft

Duration

3 weeks

Location

Laguna Beach, CA

Year

2024

Slide 3

Downtown Irvine Office Complex

Multi-story commercial rough framing with modern architectural elements and LEED certification requirements

Size

25,000 sq ft

Duration

12 weeks

Location

Irvine, CA

Year

2023

previous arrow
next arrow

Our Projects

Showcasing our finest work and exceptional craftsmanship

Luxury Subdivision’s Signature Model Home – High-End Detailing
Custom2025

Luxury Subdivision’s Signature Model Home – High-End Detailing

This downtown Irvine office complex required sophisticated rough framing techniques to accommodate the building's unique architectural design and LEED certification requirements. The project included three stories with varying floor plans, large open spaces, and structural elements that needed to support heavy loads while maintaining aesthetic appeal. We completed the rough framing phase 15% under budget and two weeks ahead of schedule, earning praise from the general contractor and architect.

Size4,800 sq. ft.
Duration12-week
Architectural Showcase Pavilion – Complex Geometries
Custom2023

Architectural Showcase Pavilion – Complex Geometries

This custom outdoor living project in Laguna Beach combined traditional woodworking techniques with modern construction methods. The pergola features hand-carved details and custom joinery, while the deck incorporates sustainable materials and innovative drainage systems. The project required precise rough framing to support the complex architectural design while withstanding coastal weather conditions. We completed the project 25% faster than estimated while exceeding quality expectations.

SizeComplex Geometries
Duration9 weeks.
Custom Lakefront Home – Precision Framing Under a Tight Deadline
Custom2025

Custom Lakefront Home – Precision Framing Under a Tight Deadline

This Huntington Beach retail space project required flexible rough framing that could accommodate various store layouts and future modifications. We implemented modular framing techniques that allow for easy reconfiguration while maintaining structural integrity. The project was completed 30% under budget and one week ahead of schedule, allowing the retail tenant to open earlier than planned.

Size4,800 sq. ft.
Duration12-week
Industrial Warehouse Expansion – Maximizing Load-Bearing Capacity
Commercial4333

Industrial Warehouse Expansion – Maximizing Load-Bearing Capacity

Rough framing for 40,000 sq. ft. warehouse expansion.Rough framing for 40,000 sq. ft. warehouse expansion.

Size40,000 sq. ft.
Duration3 weeks early
Multi-Family Development – Scalable Framing Efficiency
Commercial2024

Multi-Family Development – Scalable Framing Efficiency

This home addition project in Anaheim's historic district required careful planning to match the existing structure's framing style and materials. We seamlessly integrated the new addition while preserving the home's architectural integrity and ensuring structural compatibility. The project required special permits and careful coordination with the historic preservation board. We completed the rough framing phase with zero damage to the existing structure and received commendation from the city's historic preservation committee.

Size1,200 sq ft
Duration4 weeks
Commercial Retail Shell – Coordination with Multiple Trades
Commercial2022

Commercial Retail Shell – Coordination with Multiple Trades

This Santa Ana industrial warehouse project required robust rough framing to support heavy equipment and storage systems. We implemented advanced framing techniques to maximize space efficiency while ensuring structural integrity for long-term use. The project featured 40-foot clear spans and specialized framing to support overhead cranes and heavy machinery. We completed the rough framing phase 20% faster than industry average while maintaining the highest safety standards.

Size15,000 sq. ft.
Duration2 weeks

Project Statistics

Our track record of successful projects
Framing Projects Completed
0 +
Years Specialized Experience
0 +
Expert Team Members
0 +
Client Satisfaction
0 %

Ready to Start Your Project?

Let's discuss your framing needs and create something excepticnal together. Get a Tree coreu tation and quote for your project.