This downtown Irvine office complex required sophisticated rough framing techniques to accommodate the building’s unique architectural design and LEED certification requirements. The project included three stories with varying floor plans, large open spaces, and structural elements that needed to support heavy loads while maintaining aesthetic appeal. We completed the rough framing phase 15% under budget and two weeks ahead of schedule, earning praise from the general contractor and architect.